Main configuration of 300L Brewery Equipment
| Main brewing system | Components | Main specification |
| Brewhouse unit | Mash/lauterĀ tun | 300L 25% head space, False bottom, Spent grain outlet CIP, sight glass. |
| Kettle/whirlpoolĀ tun | 300L 30% head space, Electric heatingĀ with insulation: 18KW Steam condenser, Wort outlet and trub outlet Tangential inlet. |
|
| Wort pump | 3T/hr, Sanitary | |
| Hot liquor pump | 3T/hr, Sanitary | |
| Plate heat exchanger | 4m2 Two stages Connected with wort aeration device Disassemble |
|
| Work platform | Disassemble, Adjustable |
|
| OPTIONAL | Hopback Pneumatic valve Wort flow meter Sterile air compressor |
|
| Fermentation unit | Fermentation tank | 300L/600L 25% head space, Jacketed and insulated Conical bottom, Pressure valve, relief valve CO2 relief valve Coolant inlet and outlet Sample valve Topmanway Top, Dry Hopping Port CIP connections Wort inlet and yeast outlet Racking arm Temperature and pressure gauges |
| Maturation/Storage (OPTIONL) | Bright beer tank | 300L/600L 20% head space, Jacketed and insulated Dished head&bottom Pressure valve, relief valve Site Glass level Carbonation stone assembly Sample valve Top manway Fill/drainage port CIP connections Temperature and pressure gauges Jacketed and single wall tanks |
| Glycol cooling system | Glycol cooling tank | Thermowell Top manway CIP arm and spray ball 360 degree of coverage Thermowell |
| Cold liquor tank (OPTIONAL) | Top manway CIP arm and spray ball 360 degree of coverage Visual level sight glass Cooling jackets |
|
| Chiller | Second generation Freon R410A, R404A |
|
| Glycol water pump and piping | ||
| Controlling unit | Brewhouse/cellarĀ control panel | Temperature monitoring& controlling Pump on/off control VFD control |
| Cleaning unit | Portable CIP Pump | 3T/hr, Sanitary |
Optional items: Beer filter, Keg filling system, Bottle filling system
Steam boiler, Water filter, Kegs
Customized requirement acceptable