400L Beer Brewing Equipment Project Case in Ohio, USA – 4KD Crick Brewery

Project: 400L Beer Brewing Equipment
Location: Ohio, United States
Brewery: 4KD Crick Brewery

The beer brewing equipment includes:

1. Brewhouse Unit: MLT + KWT+ 400L HLT with electric heating
2. 3BBL Fermentation Tanks / Unitanks (6 sets)
3. Glycol Chilling Unit: 1000L Glycol Water Tank + 2 Ɨ 3HP Chillers
4. Floor-type Controlling Unit
5. Portable CIP Pump
6. Beer Kegs

This 4KD Crick Beer brewing equipment, our first brewery equipment project in the USA in 2016, is designed as a compact microbrewery suitable for craft beer production.

Beer brewing equipment

Beer Brewing Equipment Project Start

The brewery is owned by Aaron Weible, a talented brewer and chef. Not only can Aaron create delicious culinary dishes, but he also has a deep understanding of brewing processes, beer brewing equipment and beer quality. His passion and enthusiasm for craft beer laid the foundation for this project.

In early 2016, Aaron approached TIANTAI with a clear vision for his own beer brewery. Through detailed email communication, he worked closely with our team, often staying up late until 1–2 a.m. to discuss beer brewing equipment details. His knowledge and quick decision-making allowed us to finalize the configuration and close the beer brewing equipment project in just 7 days, a remarkable speed compared to our previous multi-year projects.

400L Beer Brewing Equipment 3

Manufacturing & Preparation

After confirming the equipment configuration, our team rapidly manufactured the beer brewing equipment in 2016. All tanks and components were fabricated from high-quality stainless steel and underwent strict inspections for weld quality, surface finish, and operational reliability.

400L Beer Brewing Equipment 8

400L Beer Brewing Equipment 2

The brewhouse, fermenters, glycol unit, and auxiliary equipment were prepared for shipment, ensuring a safe and smooth delivery process.

Delivery & Installation

The complete brewery equipment was shipped to Ohio, USA. Upon arrival at 4KD Crick Brewery, Aaron demonstrated his exceptional dedication by personally installing the system. His technical knowledge and patience ensured that all tanks, piping, and control systems were properly set up.

After several weeks of installation and commissioning, the brewery was fully operational and ready to produce high-quality craft beers.

400L Beer Brewing Equipment 6

400L Beer Brewing Equipment 7

400L Beer Brewing Equipment 5

Customer Experience & Project Highlights

Aaron’s vision and enthusiasm were the driving force behind this project. The 4KD Crick Brewery serves as an excellent example of a turnkey microbrewery system, combining:

Compact yet flexible brewing capacity;
Efficient electric-heated brewhouse;
Precise glycol temperature control for fermentation;
Complete set of kegs, CIP system, and control units;

Today, 4KD Crick Brewery has successfully launched, and visitors to Ohio are welcome to taste their beer and visit Eagle Rock Golf Club, where the brewery is located.

For more information or technical details about the beer brewing equipment configuration, fermenter design, or any questions you may have about starting your craft brewery.

Edited by Jane
Email: gbrewing@cnbrewery.com

Get A Quote

If you have other questions, please do not hesitate to leave your email address below, we are pretty happy to contact you soonest!

Contact Form Demo

FAQ

Do you offer installation and training services?

Yes, we provide professional installation guidance and on-site training. Our team of nearly 20 experienced installation engineers and brewmasters will ensure your equipment is correctly installed and operating smoothly, maximizing your success from start-up.

Certainly. Please share your floor plan with us, and our technical team will be glad to design a tailored equipment layout based on your specific requirements and space constraints.
We offer the following warranty coverage: – 5 years on the tank body under normal operating conditions. – 1 year on all accessories and auxiliary facilities. – 3 months on wearing parts and sensitive components, such as pump seals, gaskets, and sensors.
Scroll to Top