Craft Brewery Project in Côte d’Ivoire Under Active On-Site Installation

We are pleased to share that our craft brewery project in Côte d’Ivoire is progressing smoothly and has now entered the on-site installation and construction phase. The entire site is bustling with activity, and all work is being carried out in a well-organized and efficient manner.

657597981 2475709782871109 126411195908078164 n

This project features a complete craft brewery solution, covering the entire production process from raw material handling to final packaging. The system includes a malt milling system, 10,000L brewhouse system, 30,000L fermentation system, CIP cleaning system, yeast propagation system, utility water system, automation control system, steam system, filtration system, high-gravity dilution system, and bottling system. The comprehensive configuration and advanced technology are designed to meet the client’s demand for high-quality craft beer production.

Currently, large-scale installation and on-site fabrication work are in full swing. Our engineering team is working closely with local technicians to carry out precise installation and welding in strict accordance with the design drawings and technical standards. Every step—from piping connections and tank positioning to system integration—is being executed under rigorous quality control.

On-site welding plays a particularly critical role in this phase. All welding procedures are performed to high standards to ensure the integrity and reliability of the piping systems, providing a solid foundation for future operation. At the same time, we place strong emphasis on safety and schedule management, ensuring steady progress without compromising quality.

657386855 2475709759537778 854206769261457621 n

As the project advances, the brewery will gradually move toward full operational capability. Once completed, it will bring a wider range of high-quality craft beers to the local market and contribute to the growth of the regional brewing industry.

We will continue to closely monitor the project progress to ensure smooth delivery and commissioning, providing our customer with a reliable, turnkey brewing solution.

Project Manager: Abby Wang

Email:gbrew@cnbrewery.com

Get A Quote

If you have other questions, please do not hesitate to leave your email address below, we are pretty happy to contact you soonest!

Contact Form Demo

FAQ

Do you offer installation and training services?

Yes, we provide professional installation guidance and on-site training. Our team of nearly 20 experienced installation engineers and brewmasters will ensure your equipment is correctly installed and operating smoothly, maximizing your success from start-up.

Certainly. Please share your floor plan with us, and our technical team will be glad to design a tailored equipment layout based on your specific requirements and space constraints.
We offer the following warranty coverage: – 5 years on the tank body under normal operating conditions. – 1 year on all accessories and auxiliary facilities. – 3 months on wearing parts and sensitive components, such as pump seals, gaskets, and sensors.
Scroll to Top