

3000L Brewing System

3000L Brewing System Configuration Details:
| Milling System | Mill machine | Stainless steel |
| Grist case | Stainless steel | |
| Flexible conveyor | Outer PPR or Stainless steel | |
| Brewhouse System | Mash tun | -Inner:3mm; outer:2mm-Motor agitation-Steam jackets/Electric elements/Fire direct heating |
| Lauter tun | -Inner:3mm; outer:2mm-Rack knife system -False bottom filter -Wort Grant |
|
| Brew Kettle | -Inner:3mm; outer:2mm-Steam jackets/Electric elements/Fire direct heating | |
| Whirlpool Tank | -Inner:3mm; outer:2mm-Side tangent whirlpool inlet | |
| Hot water tank | -Inner:3mm; outer:2mm-Steam jackets/Electric elements/Fire direct heating | |
| Accessories | -Mash pump; Heat-exchange plate; Hop back system; Brewhouse Pipes; | |
| Fermentation System | Fermentation tank | -Pressure:3 Bar-Inner:3mm; outer:2mm; with insulation -Cooling jackets |
| Cooling System | Glycol water tank | -Inner:3mm; outer:2mm |
| Cold water tank | -Inner:3mm; outer:2mm | |
| Accessories | Chiller; Glycol water pump; Pipes & Valves | |
| CIP System | Acid tank, Caustic tank, Trolley | -Pump; Pipes & Valves-Accessories of the CIP System |
| Control System | -Automatic/Semi-auto | |
| Filtering System | Candle type diatomite filter/Membrane filter/Bag filter | |
| Bright beer tank | Double-layer with insulation | |
| Filling System | Glass bottle line | Capacity:800-1200 BPH-Washing heads:8; Filling heads:8; Capping heads:3 -Optional: Capacity:1500-2000 BPH -Washing heads:16; Filling heads:16; Capping heads:6 |
| Canning line | Capacity:1000-1500 CPH-Filling heads:12; Capping heads:1 | |
| Keg system | Keg filling machine; Keg washing machine; Keg washing and filling unity machine | |

FAQ:
Q1: How long would I receive the cargoes after ordering?
A1: There are mainly three phases before the equipment arrived to your
door:
1) Drawings Prepared: once the order is produced, our engineers will designed the technical drawings for you asap., and then our
factory will manufacture the equipment for you exactly based on the drawings, this would be need about 7-14 days.
2) Manufacturing: the production, testing and final finishing of the complete system would be need about 60-70 days.
3) Vessel Booking and Shipment Arranging: 7 days around.
Q2: Do you offer installation or training services?
A2: Yes engineers are available to be send to your location to help with installation or training if needed.
Q3: How do I get the replacement accessories in the future? Are they available to be found in local store?
A3: Yes most of accessories we used are most likely to be found on international stores, if not, under the circumstances that they
are not in urgent uses, we’d love to resend them to you whenever there are needs.
Life long after sales services are provided.

Tiantai Great Customers:






Contact us for more interested details please:
Email: grainbrew@cnbrewery.com
Sharon
Tiantai Brewtech
